The Grange Hotel York
15442
portfolio_page-template-default,single,single-portfolio_page,postid-15442,bridge-core-2.8.4,qode-quick-links-1.0,qodef-qi--no-touch,qi-addons-for-elementor-1.6.3,qode-page-transition-enabled,ajax_fade,page_not_loaded,,qode-theme-ver-29.7,qode-theme-bridge,qode_header_in_grid,wpb-js-composer js-comp-ver-6.6.0,vc_responsive,elementor-default,elementor-kit-15783

The Grange Hotel York

Category
Hotel
About This Project

The project included:

  • Renovation of historic hotel to create more bedrooms with the addition of accessible lifts to all floors.
  • Construct new lift shafts for two new passenger platform lifts.
  • Overhaul of kitchen areas.
  • Remodelling of basement areas to form new Brasserie restaurant.
  • Conversion of ground floor public areas to accommodate new bedrooms.
  • Overhaul of many ensuite bath/shower rooms.
  • Construct new bar area including bespoke furniture.
  • New heating and hot water systems installed throughout.
  • Overlay of hotel car park with granite sets and new shingle finish.
  • Installation of car park barrier and bollards.
  • Replace old sandstone steps with new leading down to the new Brasserie.
  • New LED car park and external lighting.
  • Redecoration throughout.