Ellesmere House Canterbury
Category
Residential
About This Project
The project included:
- Conversion of empty office units into 7 apartments on the main high street.
- Installation of Reduc 35 flooring and mesh system for sound and fire separation.
- Overhaul and decoration of all windows.
- Construct new stud partitions with MF ceilings to form bedrooms, bathrooms and open plan living areas.
- New above ground drainage installed throughout with fire collars.
- Plaster finish to all areas.
- Full decoration throughout.
- Tiled finished to bathrooms and kitchens.
- New laminate floor and carpet fitted throughout.
- New kitchens installed.
- New bathroom suites fitted.
- New electrics throughout including electric water hot water and heating systems.
- New fire detection system installed linked to retail units below.
- Installation of bespoke hardwood entrance door and frame.